DE | EN | FR | NL | ES
 
www.ldmbrass.com

Big investment LDM : new billet heating furnaces

With pride we announce that in December 2009, LDM has installed new billet furnaces including a fully automated feeding and conveyance system.

> Read more
 
www.ldmbrass.com

LDM develops solutions for drinking water purposes !

With pride we announce that our brand Blue Tap was introduced through a mass mailing on September 7th.

> Read more
 
www.ldmbrass.com

New laboratory for PTLQA Department

The Process Technology Laboratory and Quality Assurance Department (PTLQA) plays a crucial role at LDM. So that our professional specialists in this department could continue their excellent achievements, having a properly equipped laboratory was obviously essential.

> Read more
 
www.ldmbrass.com

Energy efficiency at LDM

LDM uses as much electricity in a year as an average family in 6000 years. And the amount of gas used by LDM would heat that same family’s home for a good 400 years.
That situation is set to change drastically during the next few years.

> Read more
 
www.ldmbrass.com

LDM host for the workshop with Michael Braungart

Cradle to Cradle icon Prof. Dr. Michael Braungart recently visited LDM for a workshop.
Braungart came to Drunen at the invitation of SenterNovem and the VNMI.

> Read more
 
www.ldmbrass.com

LDM is making brass to order.

DRUNEN - The LDM plaza on the top floor of the former Drunen factory building from the Lips period is a symbol for the new course which the company has been steering for more than a year.
> Read more
 
www.ldmbrass.com

LDM invests in a new Kasto band saw

On March 6 last, a new Kasto band saw was installed at LDM. The installation of this machine involved an investment of upwards of € 100,000.
> Read more
 
www.ldmbrass.com

LDM invests in new force pumps

LDM is investing in two new high-pressure force pumps in connection with the 24.5 MN water hydraulic press.
> Read more
 
www.ldmbrass.com

LDM invests in a new tensile tester

LDM is investing heavily into the renovation of its Instron tensile tester.
> Read more
 
www.ldmbrass.com

Green electricity for LDM

The electricity supply for 2009 and 2010 for LDM will be realised as 100% green electricity.

> Read more